Cadeler plc, together with its subsidiaries, operates as an offshore wind installation vessel contractor in Denmark, the United Kingdom, Germany, Poland, rest of Europe, the United States, and Taiwan. The company engages in the transport and installation of offshore wind turbine generators, foundations, and topsides and substations; maintenance of offshore wind turbine generators, and offshore structures and platforms; and offshore construction within renewable space. It also involved offshore decommissioning within renewable space; salvage assistance; and heavy lift and project cargo. In addition, the company owns and operates ten offshore jack-up windfarm installation vessels. Further, it also provides hydraulic pile driving solutions. Cadeler plc was incorporated in 2008 and is based in Norwich, United Kingdom.…
Cadeler Secures Exclusive Agreement for a Full-Scope Offshore Wind Project
Cadeler (NYSE: CDLR) is listed on the New York Stock Exchange, where its shares trade in USD. It belongs to the Engineering & Construction industry, part of the Industrials sector, and reports about 1,126 employees.
The shares were at 6.370 USD on 20 November 2026, down 61.4% over 52 weeks. Its 52-week range is 6.060 USD to 32.81 USD: the price is 80.6% below the high and 5.1% above the low.
At a market capitalisation of 2.26B USD, it trades at 10.1 times trailing earnings. The median trailing P/E of its 19 largest Engineering & Construction peers is 23.6, a discount of 57% for CDLR.
Cadeler reports return on equity of 18.6%, an operating margin of 37.2% and revenue up 21.3% year over year.
Its debt exceeds its cash by 1.40B EUR, a debt-to-equity ratio of 1.08. Its Piotroski F-score is 7 out of 9, a strong reading of its financial health. One analyst covers the stock, with an average rating of Strong Buy; their mean price target of 8.500 USD is 33.4% above the current price. The next earnings report is expected on 23 November 2026.